![]() ![]() We need to ensure that the dam in Linton Park will protect the community and the environment if and when a significant flood event happens in Rotorua.” ![]() ![]() “The current dam was built some 25 years ago and since that time, best practice and dam engineering standards have significantly tightened. Infrastructure & Environment DCE Stavros Michael says the rebuild will ensure the dam meets modern safety standards and will better protect people, property and the environment downstream from the effects of stormwater in periods of severe weather. Safety fences will be erected to ensure the public do not enter the construction site or access roads. Civil Defence Recovery Project - April 2018 Flood eventĬontractors Downer will begin the rebuild work and access to this area will be restricted for a period of about six months.Creating homes and thriving communities. ![]()
0 Comments
Leave a Reply. |